North Coast Shiplift logoNorth Coast ShipliftDarwin, Northern Territory

Shiplift & hardstand

150 Tonne Travel Lift & Hardstand

The facility lifts vessels directly from Darwin Harbour and positions them on the hardstand so inspections, maintenance, repairs and project works can be carried out.

Travel lift carrying a vessel above the lift dock at Frances Bay, Darwin

150T

Travel lift capacity

Verified facility capacity

~40m

Vessel length

Approximate maximum

~10.2m

Vessel beam

Approximate maximum

Frances Bay

Darwin NT

Minutes from the CBD

Lift capability

Verified Facility Specifications

Every lift is planned around the specific vessel — its displacement, lifting points, draft, hull configuration and the works required once ashore.

Facility specifications indicate vessels up to approximately 40 metres in length and approximately 10.2 metres beam may be accommodated, within a 150-tonne lift capacity. Actual suitability depends on vessel design, displacement, draft, lifting points and configuration, and is confirmed by North Coast Shiplift for each vessel before any lift is arranged.

Vessel supported in the slings of the travel lift on the Darwin hardstand
Lift and hardstand positioning

Vessels we lift

  • Commercial fishing vessels
  • Workboats and tugs
  • Charter and tourism vessels
  • Government and institutional vessels
  • Survey and research vessels
  • Motor yachts and sailing vessels
  • Powerboats and cruisers
  • Catamarans and multihulls
  • Recreational trailerable and moored vessels

Lift services

  • Vessel lifting and launching
  • Pressure wash on the lift
  • Hardstand positioning and blocking
  • Slipping for survey and inspection
  • Relaunch once works are complete

Hardstand use

  • Short stays for antifouling and inspections
  • Extended stays for refits and repairs
  • Multiple trades on one vessel
  • Approved contractor access
  • Availability confirmed per booking
Aerial view of the hardstand and lift dock at the Frances Bay marine facility, Darwin

Hardstand

Room to Work, Not Just Somewhere to Park

Hardstand time is where the work happens. Vessels are positioned so trades can access the hull, sterngear, machinery spaces and deck as required.

Tell us the scope, the trades involved and how long you expect to need, and our team will work through availability with you.

Ready to get your vessel out of the water?

Send your vessel details and the works required. Our team will confirm suitability and availability.

Request a Lift